TDEC ARPA Non-Competitive Grant Program Covington WWTP Improvements Project
The project consists of replacement of clarifier and thickener mechanisms and installation of new control panel for existing centrifuge, with new building addition for the control panel.
Bid Documents
(click to expand/collapse)

Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | ||
001 COVER | 534.3 KB | ||
002 C0.0 | 291.9 KB | ||
003 C2.0 | 860.1 KB | ||
004 C2.1 | 668.7 KB | ||
005 C10.0 | 2.1 MB | ||
006 C10.1 | 2.2 MB | ||
007 C10.2 | 801.0 KB | ||
008 C10.3 | 776.9 KB | ||
009 C10.4 | 794.5 KB | ||
010 C10.5 | 2.3 MB | ||
011 S0.1 | 215.5 KB | ||
012 S0.2 | 177.9 KB | ||
013 S1.1 | 187.7 KB | ||
014 S2.1 | 173.4 KB | ||
015 S3.1 | 268.0 KB | ||
016 E0.1 | 170.4 KB | ||
017 E1.0 | 550.5 KB | ||
018 E2.0 | 802.8 KB | ||
019 E2.1 | 811.5 KB | ||
020 E2.2 | 639.3 KB |