City of Madison City Center Water, Sewer, and Drainage Improvements: Hoy Road Water Well
MCWI 161-2-DW-5.5 - In general, the project consists of construction of 2,500 GPM potable water well with water treatment buildings, generator, and general site work.
Bid Documents
(click to expand/collapse)
Partial sets of Bidding Documents will not be available. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than those listed herein.
Name | Size | ||
001 G0.00 | 650.2 KB | ||
002 G0.01 | 584.1 KB | ||
003 C1.00 | 1.0 MB | ||
004 C1.01 | 751.3 KB | ||
005 C1.02 | 1.1 MB | ||
006 C1.03 | 702.0 KB | ||
007 C2.01 | 600.9 KB | ||
008 C3.01 | 596.5 KB | ||
009 C3.02 | 581.6 KB | ||
010 M1.01 | 639.6 KB | ||
011 M2.01 | 586.7 KB | ||
012 M3.01 | 687.2 KB | ||
013 E1.00 | 806.3 KB | ||
014 E1.01 | 748.0 KB | ||
015 E1.02 | 611.9 KB | ||
016 E1.03 | 681.2 KB | ||
017 EI1.01 | 681.0 KB | ||
018 El1.02 | 947.8 KB | ||
019 SD1.01 | 615.0 KB | ||
020 SD1.02 | 704.6 KB | ||
021 SD1.03 | 581.0 KB | ||
022 SD1.04 | 807.7 KB | ||
023 SD1.05 | 662.2 KB | ||
024 SD1.06 | 594.2 KB | ||
025 SD1.07 | 680.9 KB |