Mall and Tacoma Basins Sanitary Sewer Repairs

The project consists of approximately 8,760 linear feet of closed circuit television (CCTV) and cured-in-place pipe (CIPP) of 8-inch, 10-inch, and 12-inch gravity sewer mains, 2 protrusion removals, 81 service reinstatements, 440 vertical feet of manhole lining, 7 regrout chimney sections, and 4 rebuild benches.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 28.6 MB
Addendum No. 2 105.7 KB