63483 - Mark Anton Airport Terminal Reroof

“Work" of this Contract is defined in the Contract Documents to include the removal and replacement of approximately 2,300 square feet of standing seam metal roof. The scope of the work includes all gutters and downspouts, insulation replacement as needed, plywood sheathing replacement as needed, removal of existing metal roof and replacement, and other related work as shown on the drawings and/or in the specifications.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 - 63483 903.4 KB
AddendumNo. 2 - 63483 302.7 KB