Water Treatment Plant Equipment Upgrades

Project includes the rehabilitation of one raw water well, installation of new raw water piping from the existing wells, 750 GPM induced draft aerator, clearwell, two high service pumps rated at 750 GPM, new raw water meter, new finished water meter to existing elevated storage tank, new electrical panels, starters, and wiring, and new SCADA system.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
001 COVER 1.0 MB
002 C0.1 445.0 KB
003 C1.0 440.4 KB
004 C2.1 483.8 KB
005 C10.0 413.4 KB
006 C10.1 521.1 KB
007 C10.2 582.8 KB
008 E0.0 107.4 KB
009 E1.0 116.5 KB
010 E2.0 87.0 KB
011 E2.1 1.2 MB
012 S0.1 386.9 KB
013 S0.2 387.2 KB
014 S1.1 526.3 KB
015 I.1-00 460.9 KB
016 I.1-01 579.7 KB
017 I.1-02 622.2 KB
018 I.1-03 345.5 KB
019 I.1-04 420.8 KB
020 I.1-05 348.9 KB
021 I.1-06 335.8 KB
022 I.1-07 329.1 KB