Birmingham Airport Terminal Apron Concrete Pavement Rehabilitation

The work consists of the following principal items of work: spall repair, crack repair, partial slab replacement, joint seal replacement, and pavement marking on the commercial terminal apron at the Birmingham-Shuttlesworth International Airport.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications will be available for purchase at contractor’s expense, which will be fulfilled by the Barge Design Solutions, Inc.’s Planroom (https://bidding.bargedesign.com/) To purchase a hard copy set or download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811.
Name Size
001 C0.01 336.1 KB
002 C0.02 635.7 KB
003 C0.02.0 1.7 MB
004 C0.02.1 390.7 KB
005 C0.02.2 408.0 KB
006 C0.02.3 391.4 KB
007 C0.02.4 328.8 KB
008 C0.02.5 322.5 KB
009 C0.03 384.4 KB
010 C1.01 327.1 KB
011 C1.02 581.5 KB
012 C1.03 293.3 KB
013 C1.04 295.1 KB
014 C1.05 287.3 KB
015 C1.06 334.4 KB
016 C7.01 911.5 KB
017 C7.02 614.6 KB