Auburn Sanitary Sewer Rehabilitation Project (Willow Creek Lake and Auburn University Sewer Basins)

The project consists of approximately 8,862 linear feet of closed circuit television (CCTV), 1,666 linear feet of cured-in-place pipe (CIPP) of 8-inch, 24-inch, and 30- inch gravity sewer mains, 1 protrusion removal, 588 vertical feet of manhole lining, 3 chimney section regrouts, and 1 rebuild invert.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 50.3 KB
Addendum No. 2 27.2 MB
Addendum No. 3 53.2 KB
Addendum No. 4 2.3 MB
Addendum No. 5 22.0 MB