Building 399 Phase 3 Water Services

The Project consists of installing approximately 135 linear feet of 4-inch ductile iron water pipe, two 4-inch meter assemblies, and two 4-inch backflow preventer assemblies in the Main Post area of Fort Moore off of Wold Avenue.

Status

Bidding Closed

Bid Date 12/12/24 2:00pm

Company & Contacts

Barge Design Solutions
Meghan Simmons  

Location

Columbus, Georgia

Bid Information:

Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the construction of the Building 399 Phase 3 Water Services will be received at the Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901, until 2:00 p.m., local time, on December 12th, 2024, and then at said location publicly opened and read aloud.

Hard copy full sets of plans and specifications will be available for purchase at contractor’s expense, which will be fulfilled by the Barge Design Solutions, Inc.’s Planroom (https://bidding.bargedesign.com/) To purchase a hard copy set or download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811. Call prior to picking up documents to ensure availability. Partial sets of the Bidding Documents will not be available directly from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of bidding documents including addenda, if any are obtained from sources other than the Issuing Office. No part of the purchase will be refunded.