Dry Hollow Road Water Line Extension
The Project consists of constructing a new 4-inch water line extension project to upgrade the distribution system along Dry Hollow Road. The project consists of approximately 15,300 linear feet of 4-inch PVC water line; installation of two pressure reducing valve vaults; air release valves; installation of new service laterals; and installation of associated appurtenances.
Plan Holders
Date | Company | Contact |
11/5/24 9:30 pm |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
11/6/24 9:31 am |
Norris Brothers Excavating LLC
22 Northside Lane Crossville, TN, TN 38571 |
Jacob Norris
Owner
Tel: 9312776556
|