Dry Hollow Road Water Line Extension

The Project consists of constructing a new 4-inch water line extension project to upgrade the distribution system along Dry Hollow Road. The project consists of approximately 15,300 linear feet of 4-inch PVC water line; installation of two pressure reducing valve vaults; air release valves; installation of new service laterals; and installation of associated appurtenances.

Status

Bidding Closed

Bid Date 12/5/24 2:00pm

Company & Contacts

Barge Design Solutions
Mark Dewayne Noe  
(615) 252-4400

Location

Rickman, TN

Bid Information:

Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the construction of the Dry Hollow Road Water Line Extension will be received at the West Overton Utility District office, located at 684 Rickman Monterey Highway, until 2:00 p.m., local time, on December 5, 2024, and then at said location publicly opened and read aloud. Any person with disability requiring special accommodations must contact West Overton Utility District no later than 7 days prior to the bid opening.

This project is being supported with Treasury, Coronavirus State and Local Recovery Fund grant funding. Therefore, certain restrictions and other federal requirements attach to this opportunity.

The work will be awarded in one Contract.

Printed and Digital copies of bidding Documents may be obtained from https://bidding.bargedesign.com/. For questions about ordering documents, call Memphis Reprographics at 901-381-9811. Call prior to picking up documents to ensure availability. Partial sets of Bidding Documents will not be available directly from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of bidding Documents including Addenda, if any, obtained from sources other than the Issuing Office. No part of the purchase will be refunded.