Construction of One (1) Prefabricated 10,000 Sq. Ft. Warehouse
Status
Bidding Closed
Prebid Date | 4/9/24 1:00pm |
Bid Date | 4/30/24 2:00pm |
Location
6399 Haley Rd, Memphis TN 38134 (Estimated)
Bid due Tuesday, April 30, 2024 at 2:00 PM (America/Chicago)
VOLUNTARY SITE VISIT: A voluntary site visit to address questions will be held on April 9th, 2024 at 1:00 p.m.(CST)
Exterior:
26-gauge Galvalume Metal Building to match color and design adjacent warehouse at 6393 Haley Rd.
Colors: Desert Sand Panels with Burnished Slate Trim.
Structural: Red iron open span sized to code requirements
Interior:
Roof: R-38 Insulation
Walls: R-19 Insulation with Galvalume corrugated wainscot liner panels covering the lower half or the interior walls
Dimensions:
Width: 50
Length: 200
Inside Minimum Height Clearance: 16’
Square Footage: 10,000
Foundation / Slab:
Poured concrete slab: 4,000 psi limestone concrete 6” in depth reinforced with #4 rebar tied 12” on center.
Turn Down Footers with piers.
Parking:
Poured concrete parking pad on north side connecting to the existing concrete pad. 4,000 psi limestone concrete 6” depth reinforced with #4 rebar tied 12” on center.
Paved areas:
North: (between pad and Haley Rd.)
East: area between new and existing warehouse
West: Paved over existing gravel
South: Paved over existing gravel and behind new warehouse
HVAC:
Four (4) gas furnaces mounted in each corner (sized per code requirements)
Six (6) 48”x48” louvers power ventilation fans
Three (3) High Volume Low Speed (HVLS) fans 16’ each with separate controllers
Entry/Exit:
Two (2) motorized overhead doors located on the North and South walls. Size: Hight 14’ Width 20’
Two (2) metal 3070 main doors located on the North and South walls.
Plumbing/Restrooms:
One (1) unisex restroom size: 8’x8’ to include toilet sink and water heater and wall heater.
One (1) outside frost free hose bib located near the north the front of the building.
One (1) inside floor drain near the front of the building approx. 20 feet from the front entrance.
Frost-Free Water Spicket.
Lighting/Electrical:
LED high bay overhead interior lighting (16 fixtures)
Exit lights.
Emergency headlights
Exterior lighting on the North (front) side of the building with photocell.
Exterior Electrical: 16 120-volt duplex receptacles
Two (2) 50-amp receptacles on west wall.
Exterior Electrical four (4) 120-volt Duplex (2 north side, 2 south side)
Security system:
Security cameras (one exterior/two interior) PTZ cameras with hardware mounted in a cabinet near the electrical panel.
Entry alarm system on all doors.
Fencing:
Security fencing removed between the new and existing warehouse. 8’ commercial grade chain-link fencing to the new building on the north side. Post to set 10’ on center. Additionally, fence to be installed connecting the south fence to the southeast corner of the new building.